Home  /  Projects

Selected Work · 170+ Completed Projects
Aluminum · Stainless · Bronze

Projects

Temples, airports, arenas, schools and water plants
Utah · Nevada · Arizona · Washington · Wyoming
Montana · Oregon · Tennessee · North Carolina · Haiti

Glass infill balcony guardrail across the face of a stone and timber resort building

These are the projects written up in detail. They are a selection, not the record — AQMW has completed more than 170 projects since 2017. The ones below were chosen because each shows something different about how the work gets done.

Selected projects

2018–2020 · Salt Lake City, UT

SLC International Airport

4,800 linear feet of 304 stainless guardrail and handrail through the parking structure — every panel a different baluster spacing, all of it long-grain finished.

2020–2021 · Park City, UT

The Residences at St. Regis

743 linear feet of balcony guardrail, roughly half of it glass infill, anchored into post-tensioned cantilevers that were scanned before anyone drilled.

2019 · Salt Lake City, UT

City Creek Center

Twelve-foot grass-motif panels cut from 1/2" stainless plate, spliced in the field with concealed attachments welded and polished on site.

2022–2023 · St. George, UT

Career Tech High School

~450 linear feet of glass guardrail on stairs, mezzanine edges and upper corridors. Our largest glass package to that point.

2023–2024 · Elko, NV

Elko Nevada Temple

51 panels in cast aluminum plate finished in Fluropon — machined relief above every window, and an eight-piece entrance transom that reads as one.

2023 · Casper, WY

Casper Wyoming Temple

Aluminum window frames on mild steel structure, glazed with stained glass on the ground and flown into the building by crane.

2022–2023 · Helena, MT

Helena Montana Temple

Three scopes, two of them things the shop had never built: a baptistry railing, layered laser-cut transoms, and a cupola built as two welded assemblies.

2018–2019 · Memphis, TN

Memphis Tennessee Temple

A stalled bronze package taken over mid-contract with virtually no shop drawings. Hand-applied antique patina, delivered in three months.

2019 · Raleigh, NC

Raleigh North Carolina Temple

Same design, same failed subcontractor, second building — back to back with Memphis rather than a year apart.

Port-au-Prince, Haiti

Port-au-Prince Haiti Temple

The only project carrying aluminum, stainless and bronze in one building — fully welded and finished to read as mechanically connected.

2023–2025 · Sherwood, OR

Willamette Water Treatment Plant

2,780 linear feet of clear-anodized aluminum guardrail, plus stairs, embeds and 316 stainless structural. 40,457 lbs shipped.

2025–2026 · Gilbert, AZ

Gilbert Northwest Water Treatment Plant

4,530 linear feet — 63% more rail than Willamette, for the same steel fabricator. In progress.

Have a package to place?

General contractors and steel fabricators — send us the drawings, the spec section and a bid date. Estimates generally go out in two to fourteen days depending on size and scope.