Arnold Quality  /  Quality & Safety

Documented Quality Management System
AR Dimensional Verification on Every Assembly

Every assembly leaves a record.

100% AR-verified against the model before shipping
EMR 0.85  ·  Zero recordable cases in 2026
AWS D1.2 aluminum  ·  AWS D1.6 stainless

A fabricator marking and measuring an aluminum section at the bench before cutting
EMR
0.85
Recordables (2026)
Zero
General Liability
$1M occurrence
$3M aggregate
Umbrella
$5M
Verification
FabStation AR
100% of assemblies
Welding Codes
AWS D1.2 Aluminum
AWS D1.6 Stainless

A quality system is only real
if it leaves evidence.

Every assembly we ship passes through a documented quality management system that governs the work from contract review to delivery — and every step leaves a record: mill certs traced by heat, welders qualified by base metal, every assembly dimensionally verified against the model, and every nonconformance run to root cause.

What that means when you prequalify us

The system is written, authorized, reviewed annually and audited internally. It covers all work at the Logan facility: architectural and structural aluminum and stainless fabrication, rail and stair systems, and the detailing, purchasing, inspection and delivery around them.

What it guarantees you is simpler than the document that describes it. Material is traceable to the mill. Welders are qualified for the metal in front of them. Nothing ships without being verified against the model. QC can stop a truck.

The Quality Manual, welder qualification records and a sample inspection package are available on request — send us what your prequalification process needs and we will fill it out properly.

A long run of glass guardrail with a brushed stainless cap rail receding along a finished mezzanine edge

01 — Material and welding

Traceable by heat, welded by people qualified for that metal

Mill test reports are verified against the purchase order at receipt, and material identity is carried from the receiving dock through to shipping. If a question comes back on an assembly two years from now, the heat number is recoverable.

Welding runs to qualified written procedures, and welders are qualified and tracked for continuity by base metal in a single register reviewed monthly, with automatic requalification flags. Nobody welds a base metal they are not qualified for. Aluminum work is governed by AWS D1.2 and stainless by AWS D1.6, with qualified WPSs on file for both; bolting runs to the RCSC Specification and ASTM F3125.

Purchasing runs against an approved supplier list with documented supplier qualification, so the traceability chain does not begin at our door — it begins at the mill.

A welder laying a TIG bead on an aluminum rail joint, hood down
Qualified procedure, qualified welder, logged.

02 — Verification

We check the part against the model, not against a tape measure

Every assembly is dimensionally verified with FabStation AR before it ships. The 3D model is projected onto the physical part on the table in augmented reality, and deviation shows up as visible mismatch — hole position, length, angle, squareness — against the geometry the drawings actually contain.

That is a different thing from measuring. A tape measure checks the dimensions somebody thought to check. The overlay checks everything in the model, including the dimensions nobody thought to check, which is where errors actually live.

It works in both directions. It catches an assembly before it leaves the shop — and it confirms that what did ship was correct, which is the half that matters when a question comes back from the field months later. The AR reports are quality records, not screenshots, and they can go in a submittal package.

The FabStation augmented reality overlay projected onto an aluminium rail assembly on the fixture table, the green model wireframe sitting over the real tube and plate
The model, projected onto the part. Deviation shows up as mismatch.

03 — Why every assembly

The cheapest place to find a mistake is the table

A dimensional error caught on the fixture table costs an hour. The same error caught in the field costs a mobilization, a lift, a crane window and somebody else's trade standing still while it gets sorted out. On a supply-only package eight hundred miles from the shop, it costs all of that plus freight, twice.

That ratio is the entire argument for verifying 100% of assemblies rather than a sample. Sampling assumes errors distribute evenly across a package. They do not. They cluster in the assembly somebody was rushing, the one that came back from the anodizer late, the last one loaded on the trailer.

We know what field rework costs. We would rather pay for it in minutes, on a table, in Logan.

Close view of a welded corner on an aluminium stair stringer, ground and finished
Where a mistake should be found.

04 — Inspection and authority

Three documented inspections, and the authority to stop a truck

Receipt, in-process and final inspection are separate documented steps, recorded digitally in Tekla PowerFab Go — the system of record for inspections and nonconformance reports. Paper is backup only, entered within one business day.

The part that matters most to a general contractor: QC has written authority to reject work and halt shipment of any assembly that has not passed final inspection. That authority sits in the procedure, not in a case-by-case conversation with the owner.

Nonconforming work is tagged, held, run to root cause and verified closed before the job moves on.

Rows of finished aluminum rail assemblies crated and staged for shipment
Nothing leaves without a verification record.

05 — Safety

An EMR of 0.85 and no recordable cases this year

Our experience modification rate is 0.85 — below the 1.00 industry baseline, and below the 0.90 threshold most general contractors prequalify against. The 2026 OSHA 300 log shows zero recordable cases, zero days away, zero restricted duty.

Four members of the leadership and shop-lead group hold OSHA 30 certification; five more hold OSHA 10. Cards are on file and current.

Two Arnold Quality crew members in hi-vis and hard hats working on a stair handrail installation
On site at SLC International Airport.

The short version

What a prequal actually asks

Non-ferrous specialists

Aluminum, stainless and bronze are the whole scope, not a sideline. AWS D1.2 aluminum and D1.6 stainless, qualified WPSs on file for both.

Material traceable to the mill

Mill test reports verified at receipt and traced by heat all the way through shipping.

Welders qualified by base metal

Qualification and continuity tracked monthly. Nobody welds a metal they are not qualified for.

100% verified against the model

FabStation AR checks the whole geometry of every assembly before it ships, and the reports are quality records.

QC can stop a shipment

Written authority to reject work and halt delivery of anything that has not passed final inspection.

170+ completed projects

Since 2017 — temples, airports, arenas, schools, water treatment plants and towers, across nine states and internationally.

Documented and audited

A written quality management system, reviewed annually and audited by physical process walk. Manual available on request.

Licensing & insurance

Credentials on file

Contractor licensing

Utah
DOPL 11103298-5501Contractor with LRF · S220, S330, S410 · active since 2018
Nevada
NSCB 0092109C-14B Structural Steel · C-14C Ornamental Metal
Arizona
ROC 366926C-24 Ornamental Metals
Washington
ARNOLQM754JRWelding and Ornamental Metal · bonded, no license violations on record
Oregon
CCB 263899Construction Contractors Board · issued 2026

Insurance & safety

General Liability
$1,000,000 / $3,000,000Aggregate applies per project
Umbrella / Excess
$5,000,000Each occurrence and aggregate
Workers' Comp
$1,000,000Each accident · disease each employee · policy limit
Manufacturers E&O
$1,000,000
EMR
0.85Certificates of insurance issued on request

Need our Quality Manual for a prequal?

We'll send the Quality Manual, a current certificate of insurance, welder qualification records, or a sample inspection package for a project like yours. Ask for what your process requires.